Skip to the content

Environmental Assessment

A project by Landlab

About

Landlab retained WSP Canada Inc. to undertake the Schedule ‘C’ Municipal Class Environmental Assessment (MCEA) Study to accommodate the design of a complete residential waterfront community approximately 2km west of the village of Lakeport. The proposed development consists of approximately 800 residential units. Municipal water and sewage servicing, stormwater retention, and roads network are not available at the site; therefore, an options analysis will be conducted to determine the preferred option for servicing and accessing the site.

The Process

This MCEA process will follow the planning and design process for Schedule ‘C’ projects as described in the MCEA Document (October 2000 as amended in 2007, 2011 & 2015), published by the Municipal Engineer’s Association. The process includes: consultation, evaluation of alternatives, assessment of potential impacts of the proposed alternatives, and the identification of mitigation measures for any adverse impacts. Upon study completion, an Environmental Study Report (ESR) will be filed.

Lakeport Beach EA Schedule

MCEA Public Information Centres

The Municipal Class Environmental Assessment (MCEA) Study will include four Public Information Centres. Two have already taken place, so please check back regularly for upcoming sessions.

Details for upcoming sessions will be listed here as they become available.

PIC #1 was held on March 31st, 2022 to introduce the Study, discuss project timelines, and outline environmental studies. A recording of the PIC can be found below. For privacy reasons, the Q&A portion of the presentation will not be shared publicly; however, the PIC #1 Summary Report provides an overview of the Q&A period from the meeting.

PIC #2 was held on July 21, 2022 to review the Lakeport Beach EA study purpose, study area, and summarize the feedback received at PIC #1; outline the Existing Environmental Conditions; provide the Alternative Planning Solutions; and review the Evaluation of Planning Solutions. A recording of the PIC can be found below. For privacy reasons, the Q&A portion of the presentation will not be shared publicly; however, the forthcoming PIC #2 Summary Report will provide an overview of the Q&A period from the meeting.

Get the answers you’re looking for from the experts working on the Lakeport Beach EA. If you have a question please contact us so that a member of our team can help you. If you have a question that wasn't answered during the PICs, please submit a comment below so that a member of our team can help you. There are a few ways you can get in touch with us. See below.

Contact the EA Team

Phone

289.835.2519

Email

nadia.dabagh@wsp.com

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

Important Documents

View key documents related to the Lakeport Beach EA project including maps, public notices, and display materials.